Skip to main content
Residential Facilities | Division of Student Affairs
Facilities Services Projects & Initiatives Resident Resources About Us
Facilities
Residence Halls & Communities Chapter Houses RecWell
Services
Alerts & Outages Submit a Request Housekeeping Maintenance & Repairs Keys & Access Pest Prevention Planning, Design & Construction Emergency Services
Projects & Initiatives
Facilities Housing Plan Design Criteria/Facility Standards Spring Break Work in Your Residence Hall Winter Break Work in Your Residence Hall
Resident Resources
Amenities Moisture Control & Mold Keeping Your Room Clean Entering Your Living Space Community Safety Tips for Resident Assistants Frequently Asked Questions (FAQs)
About Us
Our Team Our Units How to Identify our Staff Annual Report Learning Day Scholarships Join Our Team Contact Us
Residence Halls & Communities Chapter Houses RecWell
Alerts & Outages Submit a Request Housekeeping Maintenance & Repairs Keys & Access Pest Prevention Planning, Design & Construction Emergency Services
Facilities Housing Plan Design Criteria/Facility Standards Spring Break Work in Your Residence Hall Winter Break Work in Your Residence Hall
Amenities Moisture Control & Mold Keeping Your Room Clean Entering Your Living Space Community Safety Tips for Resident Assistants Frequently Asked Questions (FAQs)
Our Team Our Units How to Identify our Staff Annual Report Learning Day Scholarships Join Our Team Contact Us
Three side-by-side photos featuring residential facilities staff: building maintenance staff on the left, service center staff in the middle, and housekeeping staff on the right.

2026 Annual Report

Home About Us 2026 Annual Report

Beginning in January 2026, new leadership brought renewed energy and a focus on how every employee contributes to the University of Maryland’s mission. Cross-training within units expanded employee skills, increased operational flexibility and strengthened our ability to deliver high-quality service to students.

The department’s resilience was also tested. Major equipment failures and facility emergencies required immediate action and coordination. From temporary heating and cooling systems that kept residence halls operational to rapid responses that restored building services, we responded around the clock to ensure students safety.

The accomplishments highlighted below reflect the dedication, professionalism and commitment of the people who make Residential Facilities successful.


Major Milestones

  • Chestertown Hall Renovation: We added air conditioning to 120 previously non-air-conditioned beds, modernized community bathrooms, refreshed student lounge and study spaces and replaced aging plumbing infrastructure. The project also upgraded the building’s electrical system to support the new air conditioning units and improved housekeeping work areas.
  • Elevator Modernization: During FY26, we advanced the modernization of elevators in Centreville, Ellicott and Cumberland Halls by replacing aging machinery, motors, controls and cab interiors.
  • Building a Culture of Recognition: Our DRF Housekeeping staff earned national recognition for their exceptional work at Eppley Recreation Center, reaching the Final Five in ISSA’s nationwide Spotless Spaces Competition.

celebration We achieved a 100% Certified Cleaning Management Institute (CMI) Cleaning Technician certification rate. Every Housekeeping employee is now certified through the industry’s leading professional credential, reinforcing DRF’s commitment to providing students with healthy, safe and exceptionally maintained living environments.


Rapid Emergency Response

We responded to several infrastructure emergencies that had the potential to significantly disrupt student life. Quick action by our staff prevented situations that could have resulted in student relocations or prolonged loss of air conditioning and hot water. Beyond securing temporary equipment, staff coordinated installation and kept students informed, minimizing disruption and allowing residential life to continue uninterrupted.

Temporary Chiller

We installed a temporary chiller in La Plata Hall after an unexpected system failure, restoring air conditioning to students within a matter of days while long-term replacement planning continued.

Cooling & Hot Water Systems

We supported installation of temporary cooling and domestic hot water systems in the South Hill Community following failures at District Thermal Plant (DTP) 1.

Winter Storm

We coordinated a department-wide response to severe winter weather, keeping pathways safe, maintaining residence hall operations, prioritizing critical heating and hot water repairs and ensuring students continued to receive essential services.


Creating Inclusive & Sustainable Spaces

We continued advancing capital and operational improvements that enhanced accessibility and sustainability throughout residence halls. 

Accessibility Improvements

We completed improvements in the Chestertown Hall lounge and restrooms and on the Caroline Hall ground floor, including:

A brightly lit, newly renovated residence hall lounge featuring a red round table with four yellow chairs and blue accent walls.
Chestertown lounge space after renovations.
  • Expanded the main entrance and selected interior door openings to meet ADA accessibility requirements.
  • Converted restroom stalls into ADA-compliant stalls.
  • Constructed an ADA-compliant break room.
  • Built an ADA-compliant reception counter to better serve students.

Sustainability Improvements

We continued advancing sustainability through operational improvements and long-term planning, including: 

Annapolis Hall office during HVAC renovations, featuring open ceiling tiles, yellow caution tape, and an orange ladder.
Annapolis Hall office during HVAC system renovations.
  • High-efficiency HVAC system and equipment upgrades in Annapolis Hall
  • Water conservation measures through low-flow plumbing fixtures in Chestertown Hall.
  • Sustainable material selection in Cumberland, Chestertown, Caroline and Frederick Hall. 
  • Energy-efficient appliances in Chestertown and Caroline Hall.

Looking Ahead

Upgrades Underway in the Ellicott Community

Two University of Maryland residence halls are receiving significant improvements that will enhance the residential experience for current and future Terps.

Planned upgrades to Ellicott Hall and Hagerstown Hall include:

  • New windows throughout the building
  • Installation of window heat pump units that provide heating and air conditioning
  • Renovated bathrooms
  • Electrical system upgrades
Residential Facilities | Division of Student Affairs
7757 Baltimore Ave, College Park, Maryland 20742, US
resfacilities@umd.edu 1-301-314-3486